
16 Gauge Multi-Function Air Tube Snap HVAC Duct Sheet Metal Pittsburgh Lock Making Seamer Former Forming Lockformer Machine
The performance of Automotive Electrical Training Board Panel, manual gearbox, spare parts car has reached the leading level in the same industry. It's a pleasure to have friends coming from afar, warmly welcome all friends from all walks of life to visit our company for investigation and guidance and establish business cooperation relationship with us. We firmly believe that professionalism creates value and trust comes from responsibility.
Configuration:
Detection control panel | Digital air inlet temperature gauge |
The ignition switch | Digital air outlet temperature gauge |
High pressure gauge | Air conditioning controller assembly |
Low pressure gauge | Air conditioning evaporator box assembly |
Dryer assembly | Electric vehicle air conditioner compressor assembly |
Blower assembly | Expansion valve assembly |
Condenser | Electric vehicle air conditioner controller |
Cooling electronic fan | Electric car battery pack |
DC/DC system | Fault simulation and elimination device |
Mobile gantry | Equipment certificate and warranty card |
Technical Parameters:
Boundary dimension: 1500 × 1000 × 1800mm (L × w × h)
Power supply: three-phase four wire (three-phase five wire 380V ± 10% 50Hz)
Input power supply: AC 220V ± 10% 50Hz
Working power supply: DC 12V
FAQ:
1.What's your sample policy?
Our products are large equipment that can't provide you with free samples, but we allow you to order one for your reference quality first.
2.After I sent Inquiry, when I can get your reply?
Because of the time difference, we usually reply later, but if we respond immediately during business hours, we guarantee that the latest response time is within 12 hours.
3.What's the quality control on your products?
We have specialized technicians to carry out strict inspections on materials, from materials to processes. The equipment needs quality inspection before leaving the factory, so there is no need to worry about quality problems.
4.What your payment term?
Our standard payment term is 50% deposit by TT, 50% balance paid against before shipment.
Drawing on our unique business culture, we are actively increasing investment in technical content, improve production scale and standardize the operating process to ensure excellent quality of our 16 Gauge Multi-Function Air Tube Snap HVAC Duct Sheet Metal Pittsburgh Lock Making Seamer Former Forming Lockformer Machine. We continue to explore and strive to achieve deep-level transformation and breakthroughs in production technology. We have always been adhering to the concept of innovation and development, optimized structure as the foundation, and technological innovation as the driving force.
You Might Also Like
Send Inquiry










